Schedule Validator, Set Up and Supported by Scheduling Experts
Score any Primavera P6 or Asta Powerproject schedule against DCMA-style health checks in minutes. Projects Analytics gets your team set up and stays on call when you need help.
- One objective SV Score for every schedule
- Flags open-ended activities, negative lag, hard constraints and more
- A defensible answer when owners or legal ask
From Projects Analytics: 30+ years of construction scheduling software, training and support.

Book a 15-minute demo
Bring one of your own schedules. We run the health check on it live.
"*" indicates required fields
Schedule Validator by the Numbers
250K+
schedules analyzed
150+
enterprise clients
92
countries
Figures published by Schedule Validator.
What the SV Score Checks

Open-ended activitiesWork with no logic tie in or out.
Missing logicGaps that hide what really drives the finish date.
High total floatActivities that could slip for months unnoticed.
Negative lagSequencing that quietly overlaps work.
Negative floatDates the plan can no longer meet.
Hard constraintsForced dates that override the logic.
Plus 20+ more checks. Your demo walks through each one on a real schedule.
Backed by Projects Analytics Support for 30+ Years
“Since the fall of 2011, FMC Technologies has relied on Project Analytics for exemplary training and support of our employees.”
Jack Gutweiler, Project Planning Supervisor, FMC Technologies Inc.
“Your training sessions have been a great help, very clear instruction of the workings of P6 and your support over the past month has been exceptional and very timely, often within the hour.”
John Soares, Project Manager, Forcum/Mackey Construction, Inc.
The Hidden Risk in Every Submitted Schedule
A schedule gets submitted, and you have no objective way to know if it’s actually good. Open-ended activities, unrealistic float, negative lag, hard constraints that quietly override logic – these problems hide inside a schedule that looks clean on the surface and only surface once the project is already behind.
By the time a scheduling problem becomes visible, it’s usually too late to fix cheaply. It’s a delay claim, a dispute with the owner, or a legal team asking you to justify a schedule you didn’t build and can’t fully defend. And because scheduler quality varies across your team and your subs, you’re never fully sure whether the schedule in front of you reflects a rigorous process or a rushed one.
Manual schedule review catches some of this – if your reviewer has the time, the experience, and the patience to dig through every activity. Most teams don’t have all three, every time, on every project.
How Construction Schedule Validation Works
- Submit the schedule. Run any project schedule through Schedule Validator – no rebuild or reformat required.
- Run the health check. Schedule Validator checks the schedule against industry-standard, DCMA-style metrics: open-ended activities, high float, negative lag, hard constraints, and more.
- Get an objective SV Score. A single, defensible score tells you how healthy the schedule is, backed by the specific checks behind it.
- Act before it’s a problem. Flag and fix schedule risks while there’s still time to correct course, not after the delay has already happened.
Why Teams Run Every Schedule Through Schedule Validator
Know a schedule is sound Before it drives budget, staffing, or client commitments.
Catch risk early Before an open-ended activity or a hard constraint turns into a real delay.
Get an objective score One you can point to instead of a subjective “this looks okay” review.
Standardize schedule quality Across every PM and scheduler, regardless of individual experience level.
Give Legal and ownership a defensible answer For when a schedule’s integrity is questioned.
Reduce the odds of a six-figure claim The kind that traces back to a schedule problem no one caught in time.
Why Schedule Validator (vs. manual review)
Manual schedule review depends entirely on who’s doing it and how much time they have. A senior scheduler might catch what a junior PM misses; a reviewer under deadline pressure might miss what a careful one would catch. That inconsistency is exactly where risk hides.
Schedule Validator replaces “does this look okay to me” with an objective SV Score run against the same industry-standard checks, every time, on every schedule. It’s not a replacement for scheduling expertise – it’s a consistent, repeatable layer that catches the specific issues (open-ended activities, high float, negative lag, hard constraints) that manual review is most likely to miss under time pressure.
Schedule Validator FAQ
We already have experienced schedulers reviewing our schedules manually. Why do we need this?
Experienced schedulers are exactly who Schedule Validator is built to support – it doesn’t replace their judgment, it gives them (and everyone reviewing behind them) a consistent, objective score to check against, so review quality doesn’t depend on who has time that week.
What exactly does the SV Score check for?
Industry-standard, DCMA-style schedule health metrics, including open-ended activities, high float, negative lag, and hard constraints. The full check list is part of the demo walkthrough, where you see each metric scored on a real schedule.
Can Schedule Validator work with schedules built in Primavera P6 or Asta Powerproject?
Schedule Validator is designed to work with the scheduling tools construction teams already use. Bring a schedule from your own environment, whether Primavera P6, Asta Powerproject, or another standard format, to the demo and we run the health check on it live, so you confirm fit against your exact setup before you commit.
Who typically uses Schedule Validator on a project – the PM, the scheduler, or Legal?
All three, depending on the use case: PMs and schedulers use it to catch issues before submission, and Construction Operations or Legal teams use the SV Score as an objective reference point when a schedule’s quality is in question.
How is this different from just running a DCMA 14-point check manually?
Schedule Validator automates that type of check into a single, consistent score, removing the manual effort and reviewer-to-reviewer inconsistency of doing it by hand on every schedule, every time.
Stop finding out too late
Stop finding out a schedule had a problem after it’s already cost you time or money. See how the SV Score gives your team an objective read on every schedule, before it becomes a claim.
Want the full product overview first? Visit the Schedule Validator product page.